Skip to main content

Winterize RV, Motorhome, Camper, Sprinkler, Faucets, Outdoor Plumbing: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blowout with Female-to-Female Adapter, 10.5" Long, Lead-Free

  • Blowout adapter with shut-off valve to winterize your recreational vehicles (RV), motorhome, camper, boat, watercraft, and travel trailer by blow out method. This is a safer, healthier, and environmentally friendlier winterization tool when compared with those winterizing kits that use antifreeze. The female-to-female adapter allows you to winterize your underground irrigation sprinkler systems, outdoor pipes, water lines, plumbing, homes, cabins, faucets, spigots, and garden hoses.
  • Its 3/4"-11 NH hose threads easily connects to a standard garden hose. Its 1/4" Industrial Interchange Quick-connect plug is the most common quick-connect fitting for air compressors in North America. This new design which incorporates fewer joints to reduce the chance of leaks.
  • The flexible and kink-free Insta-Grip hose (made in USA) allows the adapter to access tight spaces and minimizes stress on pipes and fittings. Pre-assembled length: 10.5 inches approx. Pressure rating: 250 psi. It is 100% outdoor rated, virtually indestructible, impervious to water and oil.
  • For your health and safety, the fittings are made of lead-free brass, certified to contain less than 0.25% lead. Always wear safety goggles when handling or using compressed air.
  • This winterization tool is made from the highest quality parts. The shut-off valve is made from forged brass (not brass casting) for extra strength and durability. If you are looking for a heavy duty tool that lasts a lifetime, this one is for you! This blowout adaptor may also be used to winterize sprinkler system, drip irrigation system, soaker hose, spigot, faucet, sillcock, water garden hose and hose bibb where applicable. Assembled in Wichita, Kansas, USA with domestic and foreign parts.
Brand: Vibrant Yard Co. LLC
Size: 10.5" Lead-Free + F2F Adapter
Manufacturer: Vibrant Yard Company LLC
Part Number: H2ZJLC3
Material Type: Brass
Isin: I5GXFYNEYEDB

$20.11

$20.23
1% off
  • Free shipping in US
  • Arrives:

  • Free 30-Day returns

In Stock

Sold by , Fulfilled By IBSPOT
Ships from USA

IBspot Buyer Protection

Shop confidently on IBspot, receive your item as described or your money back for eligible orders. Learn Program Terms

supported payment methods:Visa, Mastercard, Discover, Amex, Apple Pay, Google Pay

GUARANTEED SAFE CHECKOUT

More seller options

Starting from

Compare all sellers
  • MONEY BACK GUARANTEE

    30 days money back guarantee, no additional fee charged.

  • EXCELLENT SUPPORT

    We provide 24/7 online customer support via email.

  • Fast Shipping

    One week domestic shipping. Global delivery to the US in 2 weeks.

scroll to top arrow
Winterize RV, Motorhome, Camper, Sprinkler, Faucets, Outdoor Plumbing: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blowout with Female-to-Female Adapter, 10.5" Long, Lead-Free

Winterize RV, Motorhome, Camper, Sprinkler, Faucets, Outdoor Plumbing: Air Co...

$20.11 $20.23 (1% off)

A quick and easy way to blow out the water lines of your RV, motorhome, camper, boat, and travel trailer. Winterizing is easy with this blow out adapter. One end of the adapter has a male garden hose faucet/spigot/spout connection which screws directly to the city water inlet on your RV, motorhome, boat or travel trailer. The other end of the adapter has a quick-connect plug designed to connect to most air compressors. If your compressor does not have quick-connect coupler, you can easily remove the quick-connect plug with a wrench to get access to the 1/4" male NPT (national pipe thread) connection, which is a very common connection. Your local hardware store should be able to help you find the proper adapter to connect the 1/4" male NPT to your air compressor. The flexible hose allows the adapter to access tight spaces and minimizes stress on your piping and fittings. The female-to-female adapter allows you to blow out outdoor faucets. sprinkler systems, and other systems that require a female garden hose connection.

Shipping Summary:

  • Packages are shipped from Monday to Friday.
  • The usual time for processing an order is 1 to 3 business days, but may vary depending on the availability of products ordered. This period excludes delivery times, which depend on your geographic location.
  • We provide tracking for every order. Tracking will be available once your product is shipped. Each individual product may be shipped from different fulfillment centers across the globe as our product research team spends the time to source quality yet affordable products. 

Estimated delivery times:

  • Standard Shipping: 3-7 business days
  • Expedited Shipping: 2-5 business days
  • International Shipping: 10 - 15 business days

Please note that these are estimates, not guarantees. Delivery time depends on a number of variables, and there may be delays such as bad weather affecting air transport, or a package being held for inspection by Customs. ibspot is not liable for any delays in international transportation or customs clearance.

Shipments can be delivered directly to most addresses, except post office boxes. However, in certain remote areas, there may be an additional delivery charge or you may need to pick up your package from the closest service location of ibspot's shipping partner.

Shipping Status: 

As soon as your order ships, you'll receive a shipping confirmation email that includes your tracking number. 

If you don't receive a shipping confirmation email right away, don't worry! We know the delivery date or date range provided at checkout and we'll be sure to deliver the items within that timeframe.

Order changes: 

Please contact our customer support if the order needs to be canceled or modified.

Item not received: 

If you've successfully placed an order and haven't received it yet while the tracking status shows it's delivered. you'd wish to contact the carrier to hunt out your Cover as once the item is Covered we  have control over it (once it’s by the carrier), but if still persists kindly email us 

Damaged Parcel
If your package has been delivered in a PO Box, please note that we are not responsible for any damage that may result (consequences of extreme temperatures, theft, etc.). 

If you have any questions regarding shipping or want to know about the status of an order, please contact us or email to support@ibspot.com.

 

Please Read Our Return & Refund Policy Carefully: 

Return: 

You may return most items within 30 days of delivery for a full refund.

To be eligible for a return, your item must be unused and in the same condition that you received it. It must also be in the original packaging.

Several types of goods are exempt from being returned. Perishable goods such as food, flowers, newspapers or magazines cannot be returned. We also do not accept products that are intimate or sanitary goods, hazardous materials, or flammable liquids or gases.

Additional non-returnable items:

  • Gift cards
  • Downloadable software products
  • Some health and personal care items

To complete your return, we require a tracking number, which shows the items which you already returned to us.
There are certain situations where only partial refunds are granted (if applicable)

  • Book with obvious signs of use
  • CD, DVD, VHS tape, software, video game, cassette tape, or vinyl record that has been opened
  • Any item not in its original condition, is damaged or missing parts for reasons not due to our error
  • Any item that is returned more than 30 days after delivery

Items returned to us as a result of our error will receive a full refund,some returns may be subject to a restocking fee of 7% of the total item price, please contact a customer care team member to see if your return is subject. Returns that arrived on time and were as described are subject to a restocking fee.

Items returned to us that were not the result of our error, including items returned to us due to an invalid or incomplete address, will be refunded the original item price less our standard restocking fees.

You should expect to receive your refund within four weeks of giving your package to the return shipper, however, in many cases you will receive a refund more quickly. This time period includes the transit time for us to receive your return from the shipper (5 to 10 business days), the time it takes us to process your return once we receive it (3 to 5 business days), and the time it takes your bank to process our refund request (5 to 10 business days).

If you need to return an item, please Contact Us with your order number and details about the product you would like to return. We will respond quickly with instructions for how to return items from your order.


Shipping Cost

We'll pay the return shipping costs if the return is a result of our error (you received an incorrect or defective item, etc.). In other cases, you will be responsible for paying for your own shipping costs for returning your item. Shipping costs are non-refundable. If you receive a refund, the cost of return shipping will be deducted from your refund.

Depending on where you live, the time it may take for your exchanged product to reach you, may vary.

If you are shipping an item over $75, you should consider using a trackable shipping service or purchasing shipping insurance. We don’t guarantee that we will receive your returned item.

Refund: 

  • Purchases may be returned within 30 days of the shipping date for a refund. 
  • Refund will be issued to your original form of payment.
  • Refunds for orders purchased with IBSPOT Gift Cards and/or IBSPOT Notes will be issued as a  IBSPOT Gift Card and mailed to the original billing address. Gift cards cannot be redeemed for cash unless  required by law. 

Refund Processing 

• Returns to a IBSPOT store will be refunded to the original form of payment or gift card. • Mail-in returns with our prepaid return label will be refunded back to the original form of payment within 3-5  business days after we receive your return. Please allow 5-7 business days for your return to arrive at our Returns Center. 

• Note: It may take a few days until your bank posts the refund to your account. 

Claims: 

Claims related to the product. Be sure to check the details of your purchase carefully before you make the payment, and  check the contents of the package(s) promptly upon receipt. If you have a problem with the product, visit our Support  Center to find out about return shipping arrangements. 

WHICH CIRCUMSTANCES WE OFFER RETURND & REFUND: 

WRONG PRODUCT: 

If you discover your order is flawed please contact us Mail: support@ibspot.com. With photos of the wrong product we will providing a return shipping label. Once it is tracking we will ship a replacement a product immediately. 

Damages and issues 

Please inspect your order upon reception and contact us immediately if the item is defective,  damaged or if you receive the wrong item, so that we can evaluate the issue and make it right. 

Exceptions / non-returnable items 

Certain types of items cannot be returned, like perishable goods (such as food, flowers, or plants),  custom products (such as special orders or personalized items), and personal care goods (such as  beauty products). We also do not accept returns for hazardous materials, flammable liquids, or  gases. Please get in touch if you have questions or concerns about your specific item. Unfortunately, we cannot accept returns on sale items or gift cards. 

Exchanges 

The fastest way to ensure you get what you want is to return the item you have, and once the return  is accepted, make a separate purchase for the new item. 

Oops!

Sorry, it looks like some products are not available in selected quantity.

OK

delivery truck
Fast Delivery

Global delivery to the US in just days—fast, reliable, and hassle-free service every time!

safe payment
Safe Payment

Pay with the world’s most popular and secure payment methods.

headphone
24/7 Help Center

Round-the-clock assistance for a smooth shopping experience.

mail return
100% Satisfaction Guarantee

30 days return policy if you’re not satisfied with products & services

Subscribe To Our Newsletter

Statements on this website have not been evaluated by the Food and Drug Administration. Products are not intended to diagnose, treat, cure or prevent any disease.